<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	>

<channel>
	<title>R&#38;R Horn</title>
	<atom:link href="http://www.rrhorn.com/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.rrhorn.com</link>
	<description>General Engineering and Building Contractors</description>
	<pubDate>Mon, 23 Mar 2009 23:10:32 +0000</pubDate>
	<generator>http://wordpress.org/?v=2.7.1</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>Sierra Moon Development</title>
		<link>http://www.rrhorn.com/2009/03/05/sierra-moon-development/</link>
		<comments>http://www.rrhorn.com/2009/03/05/sierra-moon-development/#comments</comments>
		<pubDate>Thu, 05 Mar 2009 23:48:37 +0000</pubDate>
		<dc:creator>RR Horn</dc:creator>
		
		<category><![CDATA[Clients]]></category>

		<guid isPermaLink="false">http://www.rrhorn.com/?p=154</guid>
		<description><![CDATA[We were contracted by Schuster Homes to complete the rest of the infrastructure for this 50 acre, 50 parcel development.  We installed all underground utility lines including 6,350 feet water main, 6,000 feet of sewer main, 3,750 feet of storm drain, and 9,000 feet of joint utilities.  Also included in the contract was [...]]]></description>
			<content:encoded><![CDATA[<p>We were contracted by Schuster Homes to complete the rest of the infrastructure for this 50 acre, 50 parcel development.  We installed all underground utility lines including 6,350 feet water main, 6,000 feet of sewer main, 3,750 feet of storm drain, and 9,000 feet of joint utilities.  Also included in the contract was a sewer treatment facility, widening Hicks lane, rough grading the site, and finish grading all sidewalk and roadway areas.<br />

<a href='http://www.rrhorn.com/2009/03/05/sierra-moon-development/dsc00192/' title='dsc00192'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/dsc00192-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
<a href='http://www.rrhorn.com/2009/03/05/sierra-moon-development/dsc00995/' title='dsc00995'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/dsc00995-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
<a href='http://www.rrhorn.com/2009/03/05/sierra-moon-development/dsc00879/' title='dsc00879'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/dsc00879-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
<a href='http://www.rrhorn.com/2009/03/05/sierra-moon-development/dsc00827/' title='dsc00827'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/dsc00827-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
</p>
]]></content:encoded>
			<wfw:commentRss>http://www.rrhorn.com/2009/03/05/sierra-moon-development/feed/</wfw:commentRss>
		</item>
		<item>
		<title>Sierra Central Credit Union</title>
		<link>http://www.rrhorn.com/2009/03/05/sierra-central-credit-union/</link>
		<comments>http://www.rrhorn.com/2009/03/05/sierra-central-credit-union/#comments</comments>
		<pubDate>Thu, 05 Mar 2009 23:42:24 +0000</pubDate>
		<dc:creator>RR Horn</dc:creator>
		
		<category><![CDATA[Clients]]></category>

		<category><![CDATA[Bank]]></category>

		<category><![CDATA[Credit]]></category>

		<category><![CDATA[Feather River]]></category>

		<category><![CDATA[Integrated]]></category>

		<category><![CDATA[Paradise]]></category>

		<category><![CDATA[Sierra Central]]></category>

		<category><![CDATA[Union]]></category>

		<guid isPermaLink="false">http://www.rrhorn.com/?p=144</guid>
		<description><![CDATA[The Sierra Central Credit Union Project is located at the east end of the Feather River Rural Health Project in Paradise.  We completed the all the earthwork, base rock, paving, and underground utilities for this project as a subcontractor to Integrated Builders Group.
]]></description>
			<content:encoded><![CDATA[<p>The Sierra Central Credit Union Project is located at the east end of the Feather River Rural Health Project in Paradise.  We completed the all the earthwork, base rock, paving, and underground utilities for this project as a subcontractor to Integrated Builders Group.<br />

<a href='http://www.rrhorn.com/2009/03/05/sierra-central-credit-union/picture8/' title='picture8'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/picture8-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
<a href='http://www.rrhorn.com/2009/03/05/sierra-central-credit-union/picture1/' title='picture1'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/picture1-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
<a href='http://www.rrhorn.com/2009/03/05/sierra-central-credit-union/picture3/' title='picture3'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/picture3-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
<a href='http://www.rrhorn.com/2009/03/05/sierra-central-credit-union/picture5/' title='picture5'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/picture5-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
<a href='http://www.rrhorn.com/2009/03/05/sierra-central-credit-union/picture6/' title='picture6'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/picture6-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
<a href='http://www.rrhorn.com/2009/03/05/sierra-central-credit-union/picture7/' title='picture7'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/picture7-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
</p>
]]></content:encoded>
			<wfw:commentRss>http://www.rrhorn.com/2009/03/05/sierra-central-credit-union/feed/</wfw:commentRss>
		</item>
		<item>
		<title>Rolling Hills Shooting Range</title>
		<link>http://www.rrhorn.com/2009/03/05/rolling-hills-shooting-range/</link>
		<comments>http://www.rrhorn.com/2009/03/05/rolling-hills-shooting-range/#comments</comments>
		<pubDate>Thu, 05 Mar 2009 23:38:45 +0000</pubDate>
		<dc:creator>RR Horn</dc:creator>
		
		<category><![CDATA[Clients]]></category>

		<category><![CDATA[Casino]]></category>

		<category><![CDATA[Club]]></category>

		<category><![CDATA[Corning]]></category>

		<category><![CDATA[Gun]]></category>

		<category><![CDATA[Pistol]]></category>

		<category><![CDATA[Range]]></category>

		<category><![CDATA[Rolling Hills]]></category>

		<category><![CDATA[Shooting]]></category>

		<guid isPermaLink="false">http://www.rrhorn.com/?p=137</guid>
		<description><![CDATA[Rolling Hills Casino hired us to construct a shooting range for the clear creek gun club.  We moved 12,500 cubic yards of dirt to form berms for the rifle and pistol shooting ranges.  We also installed storm drain lines in the area.
]]></description>
			<content:encoded><![CDATA[<p>Rolling Hills Casino hired us to construct a shooting range for the clear creek gun club.  We moved 12,500 cubic yards of dirt to form berms for the rifle and pistol shooting ranges.  We also installed storm drain lines in the area.<br />

<a href='http://www.rrhorn.com/2009/03/05/rolling-hills-shooting-range/dsc00151/' title='dsc00151'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/dsc00151-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
<a href='http://www.rrhorn.com/2009/03/05/rolling-hills-shooting-range/dsc00150/' title='dsc00150'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/dsc00150-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
<a href='http://www.rrhorn.com/2009/03/05/rolling-hills-shooting-range/dsc00153/' title='dsc00153'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/dsc00153-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
<a href='http://www.rrhorn.com/2009/03/05/rolling-hills-shooting-range/dsc00986/' title='dsc00986'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/dsc00986-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
</p>
]]></content:encoded>
			<wfw:commentRss>http://www.rrhorn.com/2009/03/05/rolling-hills-shooting-range/feed/</wfw:commentRss>
		</item>
		<item>
		<title>Richfield Elementary School</title>
		<link>http://www.rrhorn.com/2009/03/05/richfield-elementary-school/</link>
		<comments>http://www.rrhorn.com/2009/03/05/richfield-elementary-school/#comments</comments>
		<pubDate>Thu, 05 Mar 2009 19:29:15 +0000</pubDate>
		<dc:creator>RR Horn</dc:creator>
		
		<category><![CDATA[Clients]]></category>

		<category><![CDATA[campus]]></category>

		<category><![CDATA[contractor]]></category>

		<category><![CDATA[Grass]]></category>

		<category><![CDATA[Richfield Elementary School]]></category>

		<category><![CDATA[school]]></category>

		<category><![CDATA[Seeding]]></category>

		<category><![CDATA[Water]]></category>

		<guid isPermaLink="false">http://www.rrhorn.com/?p=127</guid>
		<description><![CDATA[On the Richfield Elementary School campus we worked directly with the school district as a general contractor.  As a part of our site work contract we were responsible for all earthwork, aggregate base, concrete, paving, and underground utility installation of the 20 acre campus.  The underground utilities included storm drain, sewer, fire and [...]]]></description>
			<content:encoded><![CDATA[<p>On the Richfield Elementary School campus we worked directly with the school district as a general contractor.  As a part of our site work contract we were responsible for all earthwork, aggregate base, concrete, paving, and underground utility installation of the 20 acre campus.  The underground utilities included storm drain, sewer, fire and domestic water supply, wells and infrastructure, and onsite sewer treatment facilities.  Upon request of the school district we also did all irrigation systems and hydro seeding of grass areas.<br />

<a href='http://www.rrhorn.com/2009/03/05/richfield-elementary-school/photos-003/' title='photos-003'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/photos-003-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
<a href='http://www.rrhorn.com/2009/03/05/richfield-elementary-school/photos-007/' title='photos-007'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/photos-007-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
<a href='http://www.rrhorn.com/2009/03/05/richfield-elementary-school/dsc00008/' title='dsc00008'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/dsc00008-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
<a href='http://www.rrhorn.com/2009/03/05/richfield-elementary-school/dsc00040/' title='dsc00040'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/dsc00040-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
</p>
]]></content:encoded>
			<wfw:commentRss>http://www.rrhorn.com/2009/03/05/richfield-elementary-school/feed/</wfw:commentRss>
		</item>
		<item>
		<title>Hacienda Elementary School</title>
		<link>http://www.rrhorn.com/2009/03/05/hacienda-elementary-school/</link>
		<comments>http://www.rrhorn.com/2009/03/05/hacienda-elementary-school/#comments</comments>
		<pubDate>Thu, 05 Mar 2009 19:18:55 +0000</pubDate>
		<dc:creator>RR Horn</dc:creator>
		
		<category><![CDATA[Clients]]></category>

		<category><![CDATA[California City]]></category>

		<category><![CDATA[Construction]]></category>

		<category><![CDATA[Hacienda]]></category>

		<category><![CDATA[Hacienda Elementary School]]></category>

		<category><![CDATA[landscaping]]></category>

		<category><![CDATA[school]]></category>

		<category><![CDATA[Seward]]></category>

		<guid isPermaLink="false">http://www.rrhorn.com/?p=119</guid>
		<description><![CDATA[The Hacienda Elementary School project was also located in California City and we were again a subcontractor of Seward Schreder Construction.  This project did not begin until late January of 2007, but it was completed in only six months.  R&#038;R Horn was responsible for all the earthwork and underground utilities including sewer, water, [...]]]></description>
			<content:encoded><![CDATA[<p>The Hacienda Elementary School project was also located in California City and we were again a subcontractor of Seward Schreder Construction.  This project did not begin until late January of 2007, but it was completed in only six months.  R&#038;R Horn was responsible for all the earthwork and underground utilities including sewer, water, gas, storm drain, and landscaping.
<a href='http://www.rrhorn.com/2009/03/05/hacienda-elementary-school/hacienda-102/' title='hacienda-102'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/hacienda-102-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
<a href='http://www.rrhorn.com/2009/03/05/hacienda-elementary-school/img_0241/' title='img_0241'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/img_0241-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
<a href='http://www.rrhorn.com/2009/03/05/hacienda-elementary-school/picture-2/' title='picture-2'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/picture-2-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
<a href='http://www.rrhorn.com/2009/03/05/hacienda-elementary-school/picture-3/' title='picture-3'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/picture-3-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
<a href='http://www.rrhorn.com/2009/03/05/hacienda-elementary-school/picture-014/' title='picture-014'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/picture-014-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
</p>
]]></content:encoded>
			<wfw:commentRss>http://www.rrhorn.com/2009/03/05/hacienda-elementary-school/feed/</wfw:commentRss>
		</item>
		<item>
		<title>Foster Road / Skyway - Street Improvements</title>
		<link>http://www.rrhorn.com/2009/03/05/foster-road-skyway-street-improvements/</link>
		<comments>http://www.rrhorn.com/2009/03/05/foster-road-skyway-street-improvements/#comments</comments>
		<pubDate>Thu, 05 Mar 2009 19:04:53 +0000</pubDate>
		<dc:creator>RR Horn</dc:creator>
		
		<category><![CDATA[Clients]]></category>

		<category><![CDATA[Asphalt]]></category>

		<category><![CDATA[Foster]]></category>

		<category><![CDATA[Hydrant]]></category>

		<category><![CDATA[Paradise]]></category>

		<category><![CDATA[sidewalk]]></category>

		<category><![CDATA[skyway]]></category>

		<category><![CDATA[Storm Drain]]></category>

		<category><![CDATA[Street]]></category>

		<guid isPermaLink="false">http://www.rrhorn.com/?p=110</guid>
		<description><![CDATA[This was a fast track project for the Town of Paradise.  It included Storm Drain Improvements, relocating a fire hydrant, and removal and replacement of sidewalk and asphalt concrete paving.  By the hard work of our employees combined with managing four subcontractors we were able to complete the project over a week ahead [...]]]></description>
			<content:encoded><![CDATA[<p>This was a fast track project for the Town of Paradise.  It included Storm Drain Improvements, relocating a fire hydrant, and removal and replacement of sidewalk and asphalt concrete paving.  By the hard work of our employees combined with managing four subcontractors we were able to complete the project over a week ahead of the 45 day schedule.<br />

<a href='http://www.rrhorn.com/2009/03/05/foster-road-skyway-street-improvements/s5000338/' title='s5000338'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/s5000338-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
<a href='http://www.rrhorn.com/2009/03/05/foster-road-skyway-street-improvements/s5000314/' title='s5000314'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/s5000314-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
<a href='http://www.rrhorn.com/2009/03/05/foster-road-skyway-street-improvements/s5000313/' title='s5000313'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/s5000313-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
<a href='http://www.rrhorn.com/2009/03/05/foster-road-skyway-street-improvements/s5000312/' title='s5000312'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/s5000312-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
<a href='http://www.rrhorn.com/2009/03/05/foster-road-skyway-street-improvements/dsc00756/' title='dsc00756'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/dsc00756-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
<a href='http://www.rrhorn.com/2009/03/05/foster-road-skyway-street-improvements/dsc00744/' title='dsc00744'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/dsc00744-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
</p>
]]></content:encoded>
			<wfw:commentRss>http://www.rrhorn.com/2009/03/05/foster-road-skyway-street-improvements/feed/</wfw:commentRss>
		</item>
		<item>
		<title>Feather River Rural Health Hospital</title>
		<link>http://www.rrhorn.com/2009/03/05/feather-river-rural-health-hospital/</link>
		<comments>http://www.rrhorn.com/2009/03/05/feather-river-rural-health-hospital/#comments</comments>
		<pubDate>Thu, 05 Mar 2009 18:56:02 +0000</pubDate>
		<dc:creator>RR Horn</dc:creator>
		
		<category><![CDATA[Clients]]></category>

		<category><![CDATA[cubic yards]]></category>

		<category><![CDATA[Feather River]]></category>

		<category><![CDATA[Hospital]]></category>

		<category><![CDATA[Modern]]></category>

		<category><![CDATA[R&R Horn]]></category>

		<category><![CDATA[Rural]]></category>

		<category><![CDATA[Sewer]]></category>

		<guid isPermaLink="false">http://www.rrhorn.com/?p=101</guid>
		<description><![CDATA[We had two separate contracts with Modern Building for this project.  The first was for the site work which included digging out 10,000 cubic yards for the basement of hospital, clearing and all other earthwork, bringing in base rock, paving the parking lots, and widening Skyway on both sides of the road.  The [...]]]></description>
			<content:encoded><![CDATA[<p>We had two separate contracts with Modern Building for this project.  The first was for the site work which included digging out 10,000 cubic yards for the basement of hospital, clearing and all other earthwork, bringing in base rock, paving the parking lots, and widening Skyway on both sides of the road.  The second contract was to install a five tank sewer treatment system as there are no city sewer services in the area.
<a href='http://www.rrhorn.com/2009/03/05/feather-river-rural-health-hospital/rural-health-aerial-before/' title='rural-health-aerial-before'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/rural-health-aerial-before-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
<a href='http://www.rrhorn.com/2009/03/05/feather-river-rural-health-hospital/dsc00425/' title='dsc00425'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/dsc00425-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
<a href='http://www.rrhorn.com/2009/03/05/feather-river-rural-health-hospital/dsc00782/' title='dsc00782'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/dsc00782-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
<a href='http://www.rrhorn.com/2009/03/05/feather-river-rural-health-hospital/picture-027/' title='picture-027'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/picture-027-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
<a href='http://www.rrhorn.com/2009/03/05/feather-river-rural-health-hospital/rural-health-aerial-after/' title='rural-health-aerial-after'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/rural-health-aerial-after-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
</p>
]]></content:encoded>
			<wfw:commentRss>http://www.rrhorn.com/2009/03/05/feather-river-rural-health-hospital/feed/</wfw:commentRss>
		</item>
		<item>
		<title>California City High School</title>
		<link>http://www.rrhorn.com/2009/03/05/california-city-high-school/</link>
		<comments>http://www.rrhorn.com/2009/03/05/california-city-high-school/#comments</comments>
		<pubDate>Thu, 05 Mar 2009 18:42:37 +0000</pubDate>
		<dc:creator>RR Horn</dc:creator>
		
		<category><![CDATA[Clients]]></category>

		<category><![CDATA[2006]]></category>

		<category><![CDATA[2007]]></category>

		<category><![CDATA[August]]></category>

		<category><![CDATA[California City High School]]></category>

		<category><![CDATA[Classrooms]]></category>

		<category><![CDATA[Concrete]]></category>

		<category><![CDATA[Construction]]></category>

		<category><![CDATA[Seward]]></category>

		<category><![CDATA[Water]]></category>

		<guid isPermaLink="false">http://www.rrhorn.com/?p=89</guid>
		<description><![CDATA[California City High School]]></description>
			<content:encoded><![CDATA[<p>R&amp;R Horn was a subcontractor of Seward Schreder Construction on this project, which began in late November of 2006.  It was completed by August of 2007.  This project included grading 35 acres, over excavating building pads for 24 classrooms and 4 workrooms, concrete sidewalk, curb, and gutter, paving, sewer, storm drain, gas, water, and landscaping.  Included in the water line installation was over a mile of additional offsite 12” water main.
<a href='http://www.rrhorn.com/2009/03/05/california-city-high-school/img_0280/' title='img_0280'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/img_0280-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
<a href='http://www.rrhorn.com/2009/03/05/california-city-high-school/img_0287/' title='img_0287'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/img_0287-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
<a href='http://www.rrhorn.com/2009/03/05/california-city-high-school/img_0134/' title='img_0134'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/img_0134-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
<a href='http://www.rrhorn.com/2009/03/05/california-city-high-school/img_0045/' title='img_0045'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/img_0045-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
<a href='http://www.rrhorn.com/2009/03/05/california-city-high-school/cal-city-high-flood-channel-011/' title='cal-city-high-flood-channel-011'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/cal-city-high-flood-channel-011-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
<a href='http://www.rrhorn.com/2009/03/05/california-city-high-school/picture-055/' title='picture-055'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/picture-055-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
</p>
]]></content:encoded>
			<wfw:commentRss>http://www.rrhorn.com/2009/03/05/california-city-high-school/feed/</wfw:commentRss>
		</item>
		<item>
		<title>Anderson Landfill</title>
		<link>http://www.rrhorn.com/2009/03/05/anderson-landfill/</link>
		<comments>http://www.rrhorn.com/2009/03/05/anderson-landfill/#comments</comments>
		<pubDate>Thu, 05 Mar 2009 18:26:33 +0000</pubDate>
		<dc:creator>RR Horn</dc:creator>
		
		<category><![CDATA[Clients]]></category>

		<category><![CDATA[2004]]></category>

		<category><![CDATA[Anderson]]></category>

		<category><![CDATA[Dirt]]></category>

		<category><![CDATA[Dozer]]></category>

		<category><![CDATA[Dump]]></category>

		<category><![CDATA[Landfill]]></category>

		<guid isPermaLink="false">http://www.rrhorn.com/?p=82</guid>
		<description><![CDATA[The Anderson Landfill Project, completed in 2004, included moving over one million yards of dirt.]]></description>
			<content:encoded><![CDATA[<p>The Anderson Landfill Project, completed in 2004, included moving over one million yards of dirt.  R&amp;R Horn built new roads and excavated new dumping areas for the landfill.  In the picture is the construction of one of the many detention basins that were constructed.  In the background is a D-8 Dozer is pushing an open bowl 621 scraper to load out dirt of the area, while up close a D-4 Dozer is trimming the slope of the detention basin.<br />

<a href='http://www.rrhorn.com/2009/03/05/anderson-landfill/photo-04/' title='photo-04'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/photo-04-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
<a href='http://www.rrhorn.com/2009/03/05/anderson-landfill/photo-13/' title='photo-13'><img src="http://www.rrhorn.com/wp-content/uploads/2009/03/photo-13-150x150.jpg" width="150" height="150" class="attachment-thumbnail" alt="" /></a>
</p>
]]></content:encoded>
			<wfw:commentRss>http://www.rrhorn.com/2009/03/05/anderson-landfill/feed/</wfw:commentRss>
		</item>
		<item>
		<title>2009 Current Projects</title>
		<link>http://www.rrhorn.com/2009/03/05/2009-current-projects/</link>
		<comments>http://www.rrhorn.com/2009/03/05/2009-current-projects/#comments</comments>
		<pubDate>Thu, 05 Mar 2009 17:35:00 +0000</pubDate>
		<dc:creator>RR Horn</dc:creator>
		
		<category><![CDATA[Company]]></category>

		<category><![CDATA[Current Projects]]></category>

		<guid isPermaLink="false">http://www.rrhorn.com/?p=62</guid>
		<description><![CDATA[What's in the works for 2009!]]></description>
			<content:encoded><![CDATA[<p>2009 Current Projects</p>
<p>Orland High School Tennis Courts, Orland<br />
Description: Construct 6 High School Standard Tennis Courts<br />
Owner: Orland Unified School District</p>
<p>Orland High School Football Stadium Phase 2<br />
Description: Construct stadium bleachers and lighting systems<br />
Owner: Orland Unified School District</p>
<p>Orland High School Agricultural Facility<br />
Description: Construct 2 agricultural barns and 1 show arena<br />
Owner: Orland Unified School District</p>
<p>Cameo Apartment Complex<br />
Description: Construct 21 unit apartment complex<br />
Owner: Black Diamond Holdings</p>
<p>Nitrate Compliance Project Phase III<br />
Description: Sewer improvements in major city roadways<br />
Owner: City of Chico</p>
<p>Yuba County Elderberry Relocation<br />
Description: Relocation of over 50 endangered elderberry bushes<br />
Owner: River Partners</p>
<p>Private Residence Custom Lake<br />
Description: Construction of a 500,000 gallon custom lake with pump system, water features, irrigation and landscaping<br />
Owner: Private Owner</p>
<p>Kirkwood Elementary School Gymnasium<br />
Description: Construction of school gymnasium and multi-purpose building<br />
Owner: Kirkwood Unified School District</p>
<p>Concow Elementary School Domestic Water System Upgrades<br />
Description: Upgrade schools water infrastructure including well, pumps, tanks, and piping.<br />
Owner: Concow Unified School District</p>
]]></content:encoded>
			<wfw:commentRss>http://www.rrhorn.com/2009/03/05/2009-current-projects/feed/</wfw:commentRss>
		</item>
		<item>
		<title>Welcome!</title>
		<link>http://www.rrhorn.com/2008/12/18/welcome/</link>
		<comments>http://www.rrhorn.com/2008/12/18/welcome/#comments</comments>
		<pubDate>Fri, 19 Dec 2008 00:30:51 +0000</pubDate>
		<dc:creator>admin</dc:creator>
		
		<category><![CDATA[Company]]></category>

		<category><![CDATA[News]]></category>

		<category><![CDATA[Anderson]]></category>

		<category><![CDATA[Biggs]]></category>

		<category><![CDATA[Builders]]></category>

		<category><![CDATA[California]]></category>

		<category><![CDATA[Chico]]></category>

		<category><![CDATA[Clearing]]></category>

		<category><![CDATA[commercial]]></category>

		<category><![CDATA[Concrete]]></category>

		<category><![CDATA[Construction]]></category>

		<category><![CDATA[Contractors]]></category>

		<category><![CDATA[Demolition]]></category>

		<category><![CDATA[Earthwork]]></category>

		<category><![CDATA[Electrical Conduits]]></category>

		<category><![CDATA[Engineering]]></category>

		<category><![CDATA[Gas Piping]]></category>

		<category><![CDATA[General Contractor]]></category>

		<category><![CDATA[Grading]]></category>

		<category><![CDATA[Infrastructure]]></category>

		<category><![CDATA[internet]]></category>

		<category><![CDATA[Lift Stations]]></category>

		<category><![CDATA[Miscellaneous Specialties]]></category>

		<category><![CDATA[new]]></category>

		<category><![CDATA[Norcal]]></category>

		<category><![CDATA[Paving]]></category>

		<category><![CDATA[R&R Horn]]></category>

		<category><![CDATA[R&R Horn Inc]]></category>

		<category><![CDATA[Redding]]></category>

		<category><![CDATA[Sacramento]]></category>

		<category><![CDATA[school]]></category>

		<category><![CDATA[Services]]></category>

		<category><![CDATA[Sewer]]></category>

		<category><![CDATA[Sewer Treatment Systems]]></category>

		<category><![CDATA[Shasta]]></category>

		<category><![CDATA[Storm Drain]]></category>

		<category><![CDATA[Valley]]></category>

		<category><![CDATA[Water]]></category>

		<category><![CDATA[web page]]></category>

		<category><![CDATA[website]]></category>

		<guid isPermaLink="false">http://www.rrhorn.com/?p=39</guid>
		<description><![CDATA[Welcome to R&#038;R Horn Inc's new website!]]></description>
			<content:encoded><![CDATA[<p><img class="alignnone size-thumbnail wp-image-127" title="anderson" src="http://www.rrhorn.com/wp-content/uploads/2008/12/anderson-150x150.jpg" alt="" width="150" height="150" /><br />
Welcome everyone to our new page!<br />
Keep up with the latest projects and R&amp;R Horn news right here.  Please take a look around and read how R&amp;R Horn can bring your next project into reality!</p>
]]></content:encoded>
			<wfw:commentRss>http://www.rrhorn.com/2008/12/18/welcome/feed/</wfw:commentRss>
		</item>
		<item>
		<title>2008 Completed Projects</title>
		<link>http://www.rrhorn.com/2008/12/12/2008-completed-projects/</link>
		<comments>http://www.rrhorn.com/2008/12/12/2008-completed-projects/#comments</comments>
		<pubDate>Sat, 13 Dec 2008 00:27:51 +0000</pubDate>
		<dc:creator>admin</dc:creator>
		
		<category><![CDATA[Company]]></category>

		<category><![CDATA[Current Projects]]></category>

		<guid isPermaLink="false">http://www.rrhorn.com/?p=33</guid>
		<description><![CDATA[List of Projects Proudly Completed in 2008]]></description>
			<content:encoded><![CDATA[<p>2008 Completed Projects</p>
<p>Orland High School Football Stadium Phase 1, Orland<br />
Orland High School Modular Buildings, Orland<br />
North Valley Continuation School Modular Buildings, Orland<br />
EAC School Modular Buildings, Orland<br />
Bidwell Elementary School Modular Buildings, Red Bluff<br />
Richfield Elementary School Modular Buildings, Richfield<br />
Meyers Street Sewer Improvements, Chico<br />
City of Portola Proposition 1B Improvement Project, Portola<br />
Parkview Market Site Development, Chico<br />
Lassen Triplex Site Development, Chico<br />
Kirkwood Elementary School Modular Buildings, Kirkwood<br />
LaBarranca Levee Removal, Gerber<br />
Hacienda Elementary School Epic Systems and Athletic Facilities, California City<br />
California City High School Epic Systems and Athletic Facilities, California City<br />
Ewing Irrigation Yard Improvements, Chico<br />
California State University of Chico ADA Parking Lot Improvements, Chico<br />
Glenn-Colusa Canal Levee Improvements, Hamilton City<br />
Bidwell Golf Course Water Main Repair, Chico</p>
]]></content:encoded>
			<wfw:commentRss>http://www.rrhorn.com/2008/12/12/2008-completed-projects/feed/</wfw:commentRss>
		</item>
		<item>
		<title>Street Work Begins</title>
		<link>http://www.rrhorn.com/2008/09/20/street-work-begins/</link>
		<comments>http://www.rrhorn.com/2008/09/20/street-work-begins/#comments</comments>
		<pubDate>Sun, 21 Sep 2008 00:28:55 +0000</pubDate>
		<dc:creator>admin</dc:creator>
		
		<category><![CDATA[Company]]></category>

		<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://www.rrhorn.com/?p=35</guid>
		<description><![CDATA[Street Work Begins
Diana Jorgenson
Portola Editor djorgenson@plumasnews.com
Portola&#8217;s city manager announced at the last city council meeting that work begins on Nevada and Commercial streets the week of Sept. 22.
The council approved the bid at a prior meeting and the street project was awarded to R&#38;RHorn.
City Engineer Dan Bastian notified the city that the contractor expected to [...]]]></description>
			<content:encoded><![CDATA[<p><strong>Street Work Begins</strong></p>
<p>Diana Jorgenson<br />
Portola Editor <a href="mailto:djorgenson@plumasnews.com">djorgenson@plumasnews.com</a></p>
<p>Portola&#8217;s city manager announced at the last city council meeting that work begins on Nevada and Commercial streets the week of Sept. 22.</p>
<p>The council approved the bid at a prior meeting and the street project was awarded to R&amp;RHorn.<br />
City Engineer Dan Bastian notified the city that the contractor expected to begin with the demolition and construction of ADA ramps and hoped to complete the concrete work by Oct. 1.</p>
<blockquote><p>&#8220;The tentative schedule is to do the Commercial Street grinding on Nevada Street on Oct. 3,&#8221; Murphy reported. &#8220;After they do the grinding on Commercial and Nevada, they&#8217;re going to let it sit for two weeks, because they&#8217;re worried that the equipment and the grinding process will cause some water leaks. They don&#8217;t want to pave and then have the water leaks.come up through the new Pavement.&#8221;</p></blockquote>
<p>During that two weeks, the intent is to slurry 1 West Street. Paving will begin after that, with the project completed by the third week in October.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.rrhorn.com/2008/09/20/street-work-begins/feed/</wfw:commentRss>
		</item>
		<item>
		<title>Completed Projects 2007</title>
		<link>http://www.rrhorn.com/2007/12/12/completed-projects-2007/</link>
		<comments>http://www.rrhorn.com/2007/12/12/completed-projects-2007/#comments</comments>
		<pubDate>Thu, 13 Dec 2007 00:25:34 +0000</pubDate>
		<dc:creator>admin</dc:creator>
		
		<category><![CDATA[Clients]]></category>

		<category><![CDATA[Company]]></category>

		<category><![CDATA[2008]]></category>

		<category><![CDATA[CA]]></category>

		<category><![CDATA[Completed Projects]]></category>

		<category><![CDATA[Construction]]></category>

		<category><![CDATA[Projects]]></category>

		<category><![CDATA[R&R Horn]]></category>

		<guid isPermaLink="false">http://www.rrhorn.com/?p=31</guid>
		<description><![CDATA[Some notable projects R&#38;R Horn has completed
2007 Completed Projects
South Area Outfall Project, Sacramento
Ridgecrest Elementary Playground Project, Ridgecrest
Northern Recyclers Yard Reconstruction, Paradise
Foster Skyway Roadway Improvements, Paradise
Sierra Moon Sewer Treatment Plant, Chico
Sierra Central Credit Union, Paradise
Santa Ynez Modular Project, Santa Ynez
Chico Water Pollution Control Plant Upgrades, Chico
Mission High Modular Buildings, Durham
San Benito High School Modular Buildings, San [...]]]></description>
			<content:encoded><![CDATA[<p>Some notable projects R&amp;R Horn has completed</p>
<p>2007 Completed Projects</p>
<p>South Area Outfall Project, Sacramento<br />
Ridgecrest Elementary Playground Project, Ridgecrest<br />
Northern Recyclers Yard Reconstruction, Paradise<br />
Foster Skyway Roadway Improvements, Paradise<br />
Sierra Moon Sewer Treatment Plant, Chico<br />
Sierra Central Credit Union, Paradise<br />
Santa Ynez Modular Project, Santa Ynez<br />
Chico Water Pollution Control Plant Upgrades, Chico<br />
Mission High Modular Buildings, Durham<br />
San Benito High School Modular Buildings, San Benito<br />
South Area Storm Drain Project, Sacramento<br />
Rolling Hills Casino Shooting Range, Corning<br />
Lundberg Building Pad, Richvale<br />
Hacienda Elementary School Construction, California City</p>
]]></content:encoded>
			<wfw:commentRss>http://www.rrhorn.com/2007/12/12/completed-projects-2007/feed/</wfw:commentRss>
		</item>
	</channel>
</rss>
